homepage home
subscribe to Mountainstates Construction magazine subscribe
newsletters free e-newsletter
advertise
industry jobs industry jobs
Dodge Data & Analytics
Mountainstates Construction Logo
Order Your RISK FREE Subscription
comment

Road Improvements Continue on 7800 South

Text size: A A

UDOT has joined forces with West Jordan City and Jordan Valley Water Conservancy District to improve 7800 South between 2700 West and 4800 West.

The roadway will be resurfaced using full-depth reclamation, which recycles the existing road surface into new road base at significant cost savings. Crews are installing curb, gutter and sidewalks between 2700 and 4800 West.

Utilities will be relocated, along with installing storm drain, sewer and water lines. At eastbound 7800 South to the Old Bingham highway, a right turn lane will be added. A westbound through-lane and a free-right lane are being added at Bangerter Highway.

The project team includes general contractor Condie Construction of Springville and JUB Engineers of Boise. The $14-million project, which started in July, is scheduled for completion in fall 2010.

 

----- Advertising -----
Reader Photos
Photos from ENR Mountain States Photo Showcase
Dodge Lead Center
Search for local construction projects OR CALL 877-234-4246 and get a FREE Lead Now!
Search by Project Type & State





----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.